Another addition at the Maison Kimbilio site is a well providing clean water. It was hand dug by two local guys, pretty intense work in the heat of the day! It is situated between the completed toilet and shower block and what will be the outside kitchen. The next task is to get a pump installed which will get the water out of the well and into the water tank which will sit on top of the metal tower which is embedded in a concrete plinth. We then plan to install running water into the showers and toilets!